Progress IV
In a dark basement, Frank Mikolajczyk starts to rewire the main circuit panel January 6
|
Bill wires kitchen outlets May 20
|
|
Pat Trombley replacing and painting dormer siding.
At left, plumber Harold Lloyd Clauson (right) with assistant.
|
Cliff Maschke delivers gutter to rooftop
Sarnia Cabinets shares driveway with gutter installers. Homeowner steadies trash can.
Cliff and team install garage gutters
|
Ken Bunyak mounts collector and down spout
|
Marie shows off sink and broad new window sill. Dangling wires beckon the electrician.
Carol sees spice rack (top) will be handy when range is installed next to pantry. Marie demonstrates pullout below.
|
Richard Holton installs fridge, while Rob on ladder, far right, works on window trim. Painter, yellow hat, observes.
|
It's going to be sooo great to have a real kitchen after 16 months of basement living!
Trial run in new kitchen!
|
Kitchen sports new cabinets and Beth sports new medical outfit (compactor in middle of floor awaiting installation).
|
New hand rail extends a 'welcome' as backdoor visitors approach.
|
Above, rear of garage also gets a makeover: new door, entrance light, stoop, and walkway.
Left, lights add finishing touch to new garage face.
|
Porch railing includes fleur-de-lis motif in wrought iron.
Above, new stairs in exposed aggregate blend with existing terrace.
Right, limestone sills and exposed aggregate add warmth to entrance.
|
|
Finally, mock hinges and handles contribute to the 'barn door' illusion
|