"Thou, Lord, in the beginning hast laid the foundation of the earth; and the heavens are the works of thine hands..." Hebrews 1:10
|
Progress II
Air conditioning installers, masons, plumbers and painters converge.
Cowgirl Isabel helps Marie arrange tiles.
|
Rodney lowers the boom after installation of Pewabic tile at peak.
|
'Safety first' as Ian heads down ramp to use a sharp scrapping tool on the radiator project underway in garage.
|
Isabel and Courtland get the old radiator ready for a new coat of paint while Mom gives a hand.
|
|
The payoff is a beautiful, shining white radiator, ready for another heating season.
|
Chris inspects cedar pergola adjustments.
Ken Bunyak solders copper panels together for hip roof.
Wire routing, bathroom plumbing, and A/C supply lines in ceiling of kitchen and butler's pantry.
Right, Marie inscribes Bible verse behind breakfast nook counter.
|
|
Copper roof and flashing over new kitchen window ready for stucco repair.
Mike attaches pergola pillar wraps.
|
One of two decorative brackets under new kitchen window. Thanks, Hugh!
Stairs and walkway outside relocated basement door.
|
Panoramic view as of February 10, 2009. 'Painter' shown, far left.
|
Brick work awaits power washing. Garage doors, floor, driveway and landscaping are still ahead.
Dan and Keith prepare to blind nail tongue-and-groove cedar. Note black tension spring hanger (one of three) visible on right.
Keith and Dan smile for the camera.
|
Dan and Keith align top tongue-and-groove panel.
After header trim widened, Dan checks corner of archway for tight fit.
|
|