Time for renewal of the aging front porch. To start, left, porch demolition is begun by Madison Maintenance.
Note evidence of failing surface, below.
![]() |
![]() |
And, why not build a path to the driveway? Site for new sloped walk is shown on November 19, 2012.
Below, existing limestone pieces are stored on site for reuse.
![]() |







![]() |
Rebuilding porch on new footers.
Franco, installing more reinforcements, below.
![]() |
Franko of Madison completes foundation corner.
![]() |
![]() Above, view from inside.
|





![]() |
Sloped walk footers near completion.
Below, finishing touches for walk footers.
![]() |

![]() |
Reinforcement for walk installed.
Below, base ready for adding rebar and rewire.
![]() |



Right, steps and risers going into place.
Foam under drip edge as thermal and moisture break.
![]() |
![]() |
![]() |
Left, drilling for metal corner fasteners.
Below, limestone for 'arms' is set with rebar for added strength. Note metal corner fasteners.
![]() |